TheFiscalFinder
Single award · grant

Bipartisan Infrastructure Law (Bil): Lithium Metal Anode for Advanced Batteries the Objective of the Project…

A single federal award, with both ends of the trail linked.
$67.1M
total award value
2025
action date
11 mo
period
DEMS0000113
FAIN

Description

Bipartisan Infrastructure Law (Bil): Lithium Metal Anode for Advanced Batteries the Objective of the Project Is to Retrofit a Domestic Manufacturing Facility to Produce Commercial Quantities of Lithium Metal Anode (Lma) for Next Generation Lithium-Ion Batteries. The Facility Is Expected to Have the Capacity to Produce Up to 50 Metric Tons Per Annum (Mta) of Lithium Metal Anode for Downstream Solid-State Battery (Ssb) Cell Manufacturing Facilities Supporting the Light and Non-Light Duty Transportation Sectors.

RecipientOutside our Phase 1 contractor set: see methodology
Place of performanceNorth Carolina
Category
Competed?Not recorded✓ from source
Total (exact)$67,075,044

More from Department of Energy

awarded 1993$48.1B
awarded 1978$35.3B
🔎
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are ✓ from source; anything we compute or infer (corporate parents, districts, competitors) is ≈ inferred and worded carefully, never asserted as fact.