Bipartisan Infrastructure Law (Bil) Direct Recycling-Enabled Closed-Loop and Cost Competitive Domestic…

A single federal award, with both ends of the trail linked.
$55.2M
total award value
2025
action date
17 mo
period
DEMS0000110
FAIN

Description

Bipartisan Infrastructure Law (Bil) Direct Recycling-Enabled Closed-Loop and Cost Competitive Domestic Lithium Iron Phosphate Manufacturing the Objective of the Project Is to Establish a 10 Ktonne Per Annum (Ktpa) LIFEPO4 (Lfp) Cathode (Cam) Production Plant to Increase America’s Competitiveness in Lithium-Ion Battery Manufacturing, Localize the Battery Supply Chain, and Revitalize a Disadvantaged Community.

RecipientOutside our Phase 1 contractor set: see methodology
Place of performanceNorth Carolina
Category
Competed?Not recorded✓ from source
Total (exact)$55,243,798