TheFiscalFinder
Single award · grant

Bipartisan Infrastructure Law (Bil) Demonstration of Battery-Grade Lithium Hydroxide Manufacturing from…

A single federal award, with both ends of the trail linked.
$57.7M
total award value
2023
action date
39 mo
period
DEMS0000010
FAIN

Description

Bipartisan Infrastructure Law (Bil) Demonstration of Battery-Grade Lithium Hydroxide Manufacturing from Domestic Sedimentary Resources American Battery Technology Company (Abtc), Along with Its Partners, Proposes to Construct, Commission, and Operate a Large-Scale Demonstration Pre-Commercial Manufacturing Facility for the Production of Battery Grade Lithium Hydroxide from Domestic-US Unconventional Sedimentary Resources Using the Manufacturing Processing Train Developed by Abtc and Its Partners.

RecipientOutside our Phase 1 contractor set: see methodology
Place of performanceNevada
Category
Competed?Not recorded✓ from source
Total (exact)$57,744,831

More from Department of Energy

awarded 1993$48.1B
awarded 1978$35.3B
🔎
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are ✓ from source; anything we compute or infer (corporate parents, districts, competitors) is ≈ inferred and worded carefully, never asserted as fact.