TheFiscalFinder
Single award · grant

Bipartisan Infrastructure Law (Bil) - Continuous Production of Sulfide-Based Solid Electrolyte Materials for…

A single federal award, with both ends of the trail linked.
$50M
total award value
2025
action date
23 mo
period
DEMS0000122
FAIN

Description

Bipartisan Infrastructure Law (Bil) - Continuous Production of Sulfide-Based Solid Electrolyte Materials for Advanced All-Solid-State Batteries This Project Intends to Simultaneously Expand Electrolyte Production and Significantly Decrease the Electrolyte Cost While Prioritizing Employee Welfare and Safety, Community Engagement, Diversity in Stem, and Benefits to Locale Disadvantaged Communities.

RecipientOutside our Phase 1 contractor set: see methodology
Place of performanceColorado
Category
Competed?Not recorded✓ from source
Total (exact)$50,000,000

More from Department of Energy

awarded 1993$48.1B
awarded 1978$35.3B
🔎
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are ✓ from source; anything we compute or infer (corporate parents, districts, competitors) is ≈ inferred and worded carefully, never asserted as fact.