Single award · grant

Bipartisan Infrastructure Law (BIL): Commercial Production of Advanced Battery Grade Graphite the Recipient…

Award ID: DEMS0000114

FY2025 · complete year · data as of 2026-09-01

A single federal award, with both ends of the trail linked.

$124.6M
Total award value

Award DEMS0000114 is a grant from the Department of Energy, $124.6M obligated, FY2025 to FY2026, for Bipartisan Infrastructure Law (BIL): Commercial Production of Advanced Battery Grade Graphite the…. The work is performed in Alabama. Source

Description

Bipartisan Infrastructure Law (BIL): Commercial Production of Advanced Battery Grade Graphite the Recipient Is an Advanced Critical Minerals Processing Company That Has Developed an Innovative, Cost-Effective, Sustainable, and Efficient Manufacturing Process to Produce Lithium-Ion Battery Anode-Grade Coated Spherical Purified Graphite (CSPG) from Natural Flake Graphite at a Commercial Scale. The Recipient’s Sustainable CSPG Processing Technology Includes a Modular Design to Accelerate Commercial Deployments. The Primary Objective of the Project Is to Leverage the Recipient’s Ongoing Commercial Demonstration Operations and Successfully Deploy a Full Commercial Module in Its First Commercial Production Plant, Currently Planned for Muscle Shoals, Alabama to Rapidly Expand Domestic Capabilities for Necessary CSPG Production That Come with the Growing Demand for Electric Vehicles. IN the Long Run, the Recipient’s Goal Is to Continue Constructing Commercial Projects Strategically Located Throughout the US to Strengthen Domestic Manufacturing and CSPG Supply Chains, Maximize the Benefits of the Clean Energy Transition, and Reduce Reliance on Foreign Competitors for Processed Critical Minerals.

Award details

Award typeGrant
FAINDEMS0000114
Action date2025
Period10 mo
RecipientOutside our Phase 1 contractor set: see methodology
Place of performanceAlabama →
Category—
Competed?Not recordedSource
Total (exact)$124,609,721

More from Department of Energy

awarded 1993$48.1B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.