BIL - Fully Automated Production Proton Exchange Membrane Electrolyzers to Achieve Hydrogenshot the Goal of…
FY2025 · complete year · data as of 2026-09-01
A single federal award, with both ends of the trail linked.
Award DEEE0011302 is a grant from the Department of Energy, $49.6M obligated, FY2025 to FY2026, for BIL - Fully Automated Production Proton Exchange Membrane Electrolyzers to Achieve Hydrogenshot the…. Source
Description
BIL - Fully Automated Production Proton Exchange Membrane Electrolyzers to Achieve Hydrogenshot the Goal of This Program Is to Build the World’s First Fully Automated Pilot Proton Exchange Membrane (PEM) Electrolyzer Production Line. Specific Objectives Include: 1) Production Capacity of 500 MW/Year; 2) a Repeatable Design That Will Serve as the Technical Basis for Future PEM Electrolyzer Manufacturing Expansion; 3) Stack Costs of <$90/KW; and 4) Other Critical Performance Criteria Set by Nel in the Table Below (Nel 2026 Target)