Single award · grant

Belt Line Corridor from Lindbergh Center to I-85, CST

Award ID: 693JJ22630000Y230GA0009395

A single federal award, with both ends of the trail linked.

$17M
Total award value

Award 693JJ22630000Y230GA0009395 is a grant from the Department of Transportation to Georgia Department of Transportation, $17M obligated, FY2013 to FY2032, for Belt Line Corridor from Lindbergh Center to I-85, CST. The work is performed in Georgia. Source

Description

Project Title: Belt Line Corridor from Lindbergh Center to I-85, CST :::: Project Description: Belt Line Corridor from Lindbergh Center to I-85, CST; the Proposed Mainline Atlanta Beltline NE Trail Is a 14 FT Wide Concrete Shared-Use Path Approximately 2.70 Miles in Length. The Project Includes Approximately 2.10 Miles of Spur Trail 12 FT in Width. The Project Also Includes Several Walls and Bridges and a Tunnel. The Proposed Atlanta Beltline NE Trail Begins at the Existing Terminus of the Eastside Trail at the Intersection of 10TH Street and Monroe Drive.

Award details

Award typeGrant
FAIN693JJ22630000Y230GA0009395
Action date2013
Period228 mo
Place of performanceGeorgia →
Category—
Competed?Not recordedSource
Total (exact)$16,970,000

More awards to Georgia Department of Transportation

More from Department of Transportation

awarded 2022$15.6B
awarded 2022$6.2B
awarded 2022$5.9B
awarded 2021$4.1B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.