Belt Line Corridor from Lindbergh Center to I-85, CST
A single federal award, with both ends of the trail linked.
Award 693JJ22640000RA12GA0009395 is a grant from the Department of Transportation to Georgia Department of Transportation, $25M obligated, FY2013 to FY2032, for Belt Line Corridor from Lindbergh Center to I-85, CST. The work is performed in Georgia. Source
Description
Project Title: Belt Line Corridor from Lindbergh Center to I-85, CST :::: Project Description: Belt Line Corridor from Lindbergh Center to I-85, CST; the Proposed Mainline Atlanta Beltline NE Trail Is a 14 FT Wide Concrete Shared-Use Path Approximately 2.70 Miles in Length. The Project Includes Approximately 2.10 Miles of Spur Trail 12 FT in Width. The Project Also Includes Several Walls and Bridges and a Tunnel. The Proposed Atlanta Beltline NE Trail Begins at the Existing Terminus of the Eastside Trail at the Intersection of 10TH Street and Monroe Drive.