Single award · grant

Award Purpose This Project Will Plan Design and Reconstruct Wharf D of the Puerto Nuevo Docks

Award ID: 693JF72440068

FY2026 ended Sep 30 · data still posting · data as of 2026-11-01†

† DoD contract data posts to USAspending about 90 days after award.

A single federal award, with both ends of the trail linked.

$21.2M
Total award value

Award 693JF72440068 is a grant from the Department of Transportation to Puerto Rico Ports Authority, $21.2M obligated, FY2026 to FY2031, for Award Purpose This Project Will Plan Design and Reconstruct Wharf D of the Puerto Nuevo Docks. The work is performed in Puerto Rico. Source

Description

Award Purpose This Project Will Plan Design and Reconstruct Wharf D of the Puerto Nuevo Docks. Project Activities Will Include Demolition and Disposal of the Existing Concrete Platform Underwater Inspection and Debris Removal Reconstruction of the Concrete Platform and Installation of a New Fender System and Bollards. Activities to Be Performed the Project Will Have Two Components Component 1 Architectural Engineering a and E Preliminary Design and Procurement Support Develop Plans Specifications and Cost Estimate Documents Up to a 30 Percent Completion Stage for the Project. The 30 Percent Completion Stage Design Documents Will Be Used in the Procurement of a Design Build Request for Proposal RFP to Implement the Project. The Consultant Will Also Develop Design Criteria Guidelines for the Remaining 70 Percent Design Implementation and Operation. Provide Bid Support and Assist in the Request for Information RFI Process During Design Build Bid Process. Component 2 Design Build Contract and Consulting and Project Management Services. Element 1 Design Complete Design Build Package from 30 100 Percent. Element 2 Construction of Wharf D Demolition and Disposal Demolition and Disposal of Existing Platform at Wharf D Measuring 400 Linear Feet LF Will Be Systematically Demolished. This Will Include the Removal and Disposal of Both the Concrete Elements and the Supporting Steel Piles. Underwater Inspection a Thorough Underwater Survey Will Be Conducted to Detect and Catalogue Submerged Debris. Subsequent Removal of Identified Debris Will Be Carried Out to Ensure a Clear Site for Reconstruction. Reconstruction Reconstruction of the Coffer Cell or Pile Supported Platform and the Steel Sheet Pile Platform Including a Concrete Deck and Curb and Steel Sheet Piles for Both Platforms New Wale Beam for the Coffer Cell Platform. Fender Bollards and Any Pertinent Ancillary System the Scope of the Project Will Also Include the Fitting of a Fender System and the Placement of Mooring Structures Bollards at Each Wharf Which Are Crucial for the Safe Berthing of Vessels and the Effective Distribution of Mooring Forces. Element 3 Project Management Consulting and Project Management Services This Will Include Assistance During the 30 Percent Design Process Up to 100 Percent Final Construction Documents. Construction Phase During the Construction Phase Full Time Personnel Will Conduct All Activities Required for the Design Build Contract Administration Including But Not Limited to Administrative Support Compliance with the Plans and Specifications and Enforcement and Quality Assurance of the Plans in Compliance with Federal and Local Regulations. Administer the Construction Contract Through the Recipients Designated Officials Including All Required Project Management Activities. Deliverables Expected Outcomes from Page 11 Schedule G of the Grant Agreement. Performance Measure Cargo Volume Gross Tons. Unit Reported Total Tons of Cargo Moved by Vessel in the Area Defined by the Project Study Area. Tons. Performance Measure Vessel Calls. Unit Reported Total Vessel Calls Per Year. Intended Beneficiary Puerto Rico Ports Authority. Subrecipient Activities None.

Award details

Award typeGrant
FAIN693JF72440068
Action date2026
Period65 mo
Place of performancePuerto Rico →
Category—
Competed?Not recordedSource
Total (exact)$21,224,804

More awards to Puerto Rico Ports Authority

More from Department of Transportation

awarded 2022$15.6B
awarded 2022$6.2B
awarded 2022$5.9B
awarded 2021$4.1B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.