Single award · grant

Award Purpose the Project Will Reconstruct a Deteriorated Dock Wall Install Approximately Three Rail Spurs…

Award ID: 693JF72440066

FY2026 ended Sep 30 · data still posting · data as of 2026-11-01†

† DoD contract data posts to USAspending about 90 days after award.

A single federal award, with both ends of the trail linked.

$21.3M
Total award value

Award 693JF72440066 is a grant from the Department of Transportation, $21.3M obligated, FY2026 to FY2029, for Award Purpose the Project Will Reconstruct a Deteriorated Dock Wall Install Approximately Three…. The work is performed in Michigan. Source

Description

Award Purpose the Project Will Reconstruct a Deteriorated Dock Wall Install Approximately Three Rail Spurs with Switching Capability Add Covered Storage and Purchase and Install Various Cargo Handling Equipment to Redevelop the Menominee Harbor General Cargo Transportation Terminal. Activities to Be Performed Component 1 Initial Design and Engineering. This Component Will Provide All Design Engineering and Administrative Services Required to Prepare the Project for Construction. Activities Will Include Detailed Surveying Geotechnical Investigations Permitting and Preparation of Construction Drawings and Technical Specifications for All Major Project Elements. Engineering Will Also Develop Construction Phasing Plans to Confirm the Bulkhead Wall/Dock Rebuild Rail Upgrades Indoor Storage Facilities and Cargo Handling Equipment Installations Are Coordinated. Component 2 Bulkhead Wall Dock Rebuild This Project Will Rebuild an Approximately 570 Linear Feet LF Section of the Bulkhead Wall Using Sheet Pile to a Depth of Approximately 327 Feet FT Ensuring IT Can Accommodate Fully Loaded Vessels. A Steel Pile Cap Will Cover the Sheet Pile and a Relieving Platform Will Be Installed for Cargo Transloading. Component 3 Rail Upgrades Three New Rail Spurs Totaling Approximately 2300 LF Will Be Installed and Four Switches Added to Provide Incoming Transport for New and Additional Cargo. Component 4 Indoor Storage an Approximately 40000 Square Foot SF Storage Building Will Be Constructed in the Rail Area. IT Will Allow Product Storage and Handling for Products That Require Separation to Prevent Blending and Enable Rail Car Loading of Each Product Independently. Additionally a Covered Storage Shed Called a Rub Shed Approximately 28300 SF Will Be Installed at the New Dock to Provide Covered Storage for Products Such as Lumber Transported by Ship. Component 5 Cargo Handling Equipment the Following Equipment Will Be Purchased and Installed at the Terminal 2 Cranes Rated at Approximately 220 Tons 2 Ship Loading Conveyors 1 Bridge Crane 1 Approximately 100 Ton Forklift Replacement 1 Full Length Truck Scale 2 Each of the Following Dump Trucks Dump Trailers Dump Pups Tractors Deliverables Expected Outcomes from Page 11 Schedule G of the Grant Agreement Performance Measure Cargo Volume. Unit Reported Total Tons of Cargo Moved Per Year Teus or Short Tons Cargo Volume Measures the Movement of Freight Through the Project Study Area. When Applicable Report the Total Cargo Volume and the Volume Disaggregated by Type of Freight Ie Containers in Teu and Bulk in Tons or Type of Intermodal Transport Truck or Rail. Measure Vessel Calls. Unit Reported Total Vessel Calls Per Year Measures the Number of Vessels Calling to the Project Study Area. Must Be Reported in Total and Disaggregated by Any of the Following Where Applicable: Vessel Type Eg Container Reported in Total and Disaggregated by Any of the Following Where Applicable Vessel Type Eg Container Bulk Ro Ro LNG Freight Capacity Vessel Length or Other. Intended Beneficiary City of Menominee. Subrecipient Activities None.

Award details

Award typeGrant
FAIN693JF72440066
Action date2026
Period39 mo
RecipientOutside our Phase 1 contractor set: see methodology
Place of performanceMichigan →
Category—
Competed?Not recordedSource
Total (exact)$21,252,532

More from Department of Transportation

awarded 2022$15.6B
awarded 2022$6.2B
awarded 2022$5.9B
awarded 2021$4.1B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.