Single award · grant

Award Purpose the Project Consists of Four Construction Elements at the Port of Muskogee on the Mcclellan…

Award ID: 693JF72344035

FY2026 ended Sep 30 · data still posting · data as of 2026-11-01†

† DoD contract data posts to USAspending about 90 days after award.

A single federal award, with both ends of the trail linked.

$24M
Total award value

Award 693JF72344035 is a grant from the Department of Transportation, $24M obligated, FY2026 to FY2029, for Award Purpose the Project Consists of Four Construction Elements at the Port of Muskogee on the…. The work is performed in Oklahoma. Source

Description

Award Purpose the Project Consists of Four Construction Elements at the Port of Muskogee on the Mcclellan Kerr Arkansas River Navigation System 1 Reconstruction of the Main Dock at Oakley Terminal 2 Construction of a New Heavy Lift Dock 3 Reconstruction of on Dock Rail and 4 Construction of a New Flexible Use Warehouse. Activities to Be Performed the Scope of Work of the Project Consists of the Following Components Component 1 Engineering and Construction Management Services Element 1 Preliminary Engineering to the 60 Percent Design Level Element 2 Final Design Through PS and E for Component 4 Element 3 Construction Management and Inspection Element 4 Environmental Analysis Component 2 Grant Program Administration Independent Contractor Administration Support Services for Grant Management Oversight Including Marad Compliance and Communication Project Reporting and Reimbursements. Component 3 Legal Accounting and Audit Services Ancillary Contracted Services for Single Audit and Legal Services as Needed for Contract Review Etc Component 4 Construction Element 1 Dockside Rail Main Cargo Wharf Replacement Demolition of Existing Railroad Existing Railroad Ballast Pavement Existing 24 Steel Stormwater Pipe Existing Bulkhead Support and Pile Grain Conveyor Pit and Equipment Existing Stairs and Gangway Existing Concrete Associated with the Existing Dock Existing Riprap Embankment Associated with the Existing Rail Site Improvements Installation of Approximately 1300 Linear Feet LF of Rail and Ties with Corresponding Railroad Ballast Approximately 7800 Square Feet SF of 8 5 Heavy Duty Concrete Pavement Approximately 70 LF of 24 Steel Stormwater Pipe Wharf Improvements Approximately 360 LF of New Bulkhead Wall Bank Stabilization Utilizing Riprap and Geotextile Fabric Approximately 200 LF of Safety Rail Fender System Approximately 2000 Square Yards Sy of Concrete Deck Bollards Ladders Gangway and Stairs 12 Curb Utilities 24 Steel Stormwater Pipe and Electrical Erosion and Sediment Control Approximately 2100 LF of Silt Fence Seeded Sodded Areas Disturbed Approximately 400 LF of Turbidity Curtain Element 2 New Heavy Lift Dock Demolition of Approximately 22500 SF of Existing Concrete Pavement Approximately 2000 SF of Existing Building Structure Port Equipment Grain Pit and Conveyor Approximately 650 LF of Overhead Electrical Lines and Six Overhead Electric Poles Approximately 130 LF of Existing Water Line Cut Cap Approximately 50 LF of Existing 12 Corrugate Plastic Pipe Existing Storm Structure Approximately 700 Cubic Yards Cy of Existing Embankment Approximately 90 LF of Existing Gas Line Cut Cap Site Improvements Approximately 3550 Sy of Heavy Lift Dock Approximately 14225 SF of 8 5 Heavy Duty Concrete Pavement Approximately 80 LF of Safety Rail Fender System Bollards 12 Curb Utilities Route Approximately 650 LF of Electrical Line Underground Relocate One Electrical Transformer Erosion and Sediment Control Approximately 550 LF Turbidity Curtain Approximately 2100 Tons of Rip Rap for Bank Stabilization Seeded Sodded Area Element 3 New Warehouse Demolition of Approximately 92900 SF of Existing Gravel Approximately 33900 SF of Clear and Grub Approximately 2700 SF of Existing Building and Foundation Approximately 20000 SF of Existing Transit Warehouse and Foundation Site Improvements Construction of a New 36000 SF Warehouse Approximately 86800 SF of 8 5 Heavy Duty Concrete Pavement Approximately 2800 SF of 5 5 Light Duty Concrete Pavement Approximately 265 LF of Concrete Curb and Gutter Approximately 70 Sy of Concrete Sidewalk Utilities Approximately 200 LF of Sanitary Sewer Pipe and Appurtenances Approximately 210 LF of Water Pipe and Appurtenances Approximately 225 LF of Gas Pipe and Appurtenances Approximately 75 LF of Underground Electric Line and Appurtenances Approximately 50 LF of Underground Telecom Line and Appurtenances. Erosion and Sediment Control Approximately 830 LF of Silt Fence Seeded Sodded Area Element 4 Project Quality Assurance Quality Control and Safety Program Qa QC Engineer Will Follow Strict 6 Step Quality Process for All Elements of Project Written and Qualified Safety and Emergency Action Contact Plans and Placarding Posting Will Be a Contract Requirement of All Contractors and Subcontractors Performing Project Work. Periodic Compliance Checks Will Be Made During the Construction Process. Deliverables Expected Outcomes from Schedule G of the Grant Agreement Page 13 Measure Gross Tons. Category and Description Economic Competitiveness the Movement of Gross Tonnage of Freight in the Area Defined by the Project Study Area. Secondary Variable Types of Freight Types of Intermodal Transport. Measurement Frequency Quarterly. Measure Vessel Calls. Category and Description Economic Competitiveness Vessel Type and or Freight Capacity of the Vessel Calling to the Area Defined in the Project Study Area. Measurement Frequency Quarterly. Intended Beneficiary Muskogee City County Port Authority. Subrecipient Activities None.

Award details

Award typeGrant
FAIN693JF72344035
Action date2026
Period39 mo
RecipientOutside our Phase 1 contractor set: see methodology
Place of performanceOklahoma →
Category—
Competed?Not recordedSource
Total (exact)$23,955,557

More from Department of Transportation

awarded 2022$15.6B
awarded 2022$6.2B
awarded 2022$5.9B
awarded 2021$4.1B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.