A single federal award, with both ends of the trail linked.
$130.1M
total award value
2015
action date
57 mo
period
GS05P15FDC7002
PIID

Description

Igf::ot::igf Award of the Construction Manager as Constructor (Cmc) for the Alteration of the Theodore Levin Courthouse Project, in Detroit, Mi.

RecipientOutside our Phase 1 contractor set: see methodology
Place of performanceMichigan
Competed?Not recorded✓ from source
Total (exact)$130,119,591

More from General Services Administration

awarded 2015$1.2B
🔎
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are ✓ from source; figures we calculate are ≈ computed; links we infer (corporate parents, districts, competitors, connections between records) are ≈ inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.