Single award · contract

Award Delivery Order W56HZV-19-F-0116 (0005) Against the Abrams Requirements Contract (Arc) to Procure 174…

Award ID: W56HZV19F0116

A single federal award, with both ends of the trail linked.

$696.1M
Total award value

Award W56HZV19F0116 is a contract from the Department of Defense to General Dynamics Land Systems Inc., $696.1M obligated, FY2019 to FY2022, for Award Delivery Order W56HZV-19-F-0116 (0005) Against the Abrams Requirements Contract (Arc) to…. The work is performed in Michigan. It is classified as NAICS 336992 (Military Armored Vehicle, Tank, and Tank Component Manufacturing) and PSC 2350 (Combat, Assault, and Tactical Vehicles, Tracked). Source

Description

Award Delivery Order W56HZV-19-F-0116 (0005) Against the Abrams Requirements Contract (Arc) to Procure 174 Abrams Vehicle Upgrades to the Latest M1A2 System Enhancement Package Version 3 (SEPV3) Configuration, Along with the Supporting Integrated Product Support (IPS), Repair of Defective Government Material (DGM), and the Replacement of Washed-Out Anniston Army Depot (Anad) Reclaimed Components. The Delivery Order Consists of Three Contract Types: Fixed Price Incentive-Firm (FPIF), Firm Fixed Price (FFP), and Cost Plus Fixed Fee (Cpff). The Total Ceiling Cost of Delivery Order W56HZV-19-F-0116 (0005) for the Vehicles, Supporting Items, and Repair Is Estimated at $740.4M. This Delivery Order Is in Support of Product Manager Main Battle Tank Systems (Pd Mbts) and Will Be Funded with Fiscal Year (Fy) 18-19 Paa and EDI Funds.

Award details

Award typeContract
PIIDW56HZV19F0116
Action date2018
Period40 mo
Place of performanceMichigan →
Competed?Not recordedSource
Total (exact)$696,102,141

More awards to General Dynamics Land Systems Inc.

More from Department of Defense

awarded 2016$51.3B
awarded 2001$34.2B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.