Single award · grant

Apple Capital Loop (Segments 1, 2A, 2C, and 4)

Award ID: 693JJ22340000Z43EWA9904017

A single federal award, with both ends of the trail linked.

$94.5M
Total award value

Award 693JJ22340000Z43EWA9904017 is a grant from the Department of Transportation to Washington ST Department of Transportation, $94.5M obligated, for Apple Capital Loop (Segments 1, 2A, 2C, and 4). The work is performed in Washington. Source

Description

Project Title: Apple Capital Loop (Segments 1, 2A, 2C, and 4) :::: Project Description: Construct Projects on the Apple Capital Loop, Including Intersection Improvements to SR 285/NORTH Wenatchee Ave, Railroad Underpass on Mckittrick Street, Replacement of a Signalized Intersection with a Roundabout at US 2/EASY Street, Create a Bypass of SR 285, and Widen a Segment of SR 28.

Award details

Award typeGrant
FAIN693JJ22340000Z43EWA9904017
Action date—
Period—
Place of performanceWashington →
Category—
Competed?Not recordedSource
Total (exact)$94,537,004

More awards to Washington ST Department of Transportation

More from Department of Transportation

awarded 2022$15.6B
awarded 2022$6.2B
awarded 2022$5.9B
awarded 2021$4.1B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.