Single award · contract
Advanced Procurement of Long Lead Materials, Non-Recurring Engineering and Critical Work Center Efforts in…
Award ID: N0002409C5111
A single federal award, with both ends of the trail linked.
$334.7M
Total award value
Award N0002409C5111 is a contract from the Department of Defense, $334.7M obligated, FY2009 to FY2017, for Advanced Procurement of Long Lead Materials, Non-Recurring Engineering and Critical Work Center…. The work is performed in Massachusetts. It is classified as NAICS 335929 (Other Communication and Energy Wire Manufacturing) and PSC 1260 (Fire Control Designating and Indicating Equipment). Source
Description
Advanced Procurement of Long Lead Materials, Non-Recurring Engineering and Critical Work Center Efforts in Support of Production of the DDG 113 AWS Ship Set.
Award details
Award typeContract
PIIDN0002409C5111
Action date2009
Period96 mo
Awarding agencyDepartment of Defense →
RecipientOutside our Phase 1 contractor set: see methodology
Place of performanceMassachusetts →
CategoryNAICS 335929PSC 1260
Competed?Not recordedSource
Total (exact)$334,722,237
More from Department of Defense
awarded 2016$51.3B
awarded 2017$35.7B
awarded 2017$35.1B
awarded 2001$34.2B
awarded 2011$32B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.