Single award · contract
Advance Procurement to Support Lot 7 Full Rate Production Long Lead Items
Award ID: W58RGZ16C0023
A single federal award, with both ends of the trail linked.
$7.5B
Total award value
Award W58RGZ16C0023 is a contract from the Department of Defense to The Boeing Company, $7.5B obligated, FY2016 to FY2027, for Advance Procurement to Support Lot 7 Full Rate Production Long Lead Items. The work is performed in Arizona. It is classified as NAICS 336411 (Aircraft Manufacturing) and PSC 5342 (Hardware, Weapon System). Source
Agency ›
Department of Defense
Source
awarded→$7.5B
Recipient ›
The Boeing Company
Source
performed in→
Description
W58RGZ-16-C-0023 Is for the Award of Advance Procurement in the Amount of $184,930,000.00 to Support Lot 7 Full Rate Production Long Lead Items.
Award details
Award typeContract
PIIDW58RGZ16C0023
Action date2016
Period137 mo
Awarding agencyDepartment of Defense →
RecipientThe Boeing Company →
Place of performanceArizona →
CategoryNAICS 336411PSC 5342
Competed?Not recordedSource
Total (exact)$7,473,242,017
More awards to The Boeing Company
awarded 2021$3.5B
awarded 2006$2.4B
awarded 2014$1.5B
More from Department of Defense
awarded 2016$51.3B
awarded 2017$35.7B
awarded 2017$35.1B
awarded 2001$34.2B
awarded 2011$32B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.