Single award · contract

Advance Procurement of Long Lead for LRIP for C-5M Rerp

Award ID: FA862507C6471

A single federal award, with both ends of the trail linked.

$5B
Total award value

Award FA862507C6471 is a contract from the Department of Defense to Lockheed Martin Corp, $5B obligated, FY2007 to FY2019, for Advance Procurement of Long Lead for LRIP for C-5M Rerp. The work is performed in Georgia. It is classified as NAICS 336411 (Aircraft Manufacturing) and PSC 1510 (Aircraft, Fixed Wing). Source

Award details

Award typeContract
PIIDFA862507C6471
Action date2007
Period141 mo
Place of performanceGeorgia →
Competed?Not recordedSource
Total (exact)$4,996,841,729

More awards to Lockheed Martin Corp

awarded 2006$7.3B

More from Department of Defense

awarded 2016$51.3B
awarded 2001$34.2B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.